Ramp Infrastructure & Facility Report
Located at the terminus of Cook Road within the Stony Point Foreshore Reserve in Crib Point, this high-use facility is a critical western shoreline hub for Western Port. The ramp infrastructure features a robust three-lane concrete ramp flanked by floating pontoons and an adjacent fixed jetty structure. The facility is subject to severe hazards, including exceptionally strong tidal currents running through the main shipping channel, low-water shoaling, and dangerous bow-waves from commercial passenger ferries operating at the adjacent Stony Point Jetty.
Pre-Launch Fuel & Donut Defense
Wasting $150 on fuel and fresh bait to run into dead water is an embarrassing donut. Strike Club translates local water flow, tidal turnaround, and atmospheric pressure into one simple call: If it is green, hook up the trailer. If it is red, stay in bed.
Unlock 72h Ramp Forecast ($79/yr) →
